![]() |
![]() |
|
![]() |
Office of Facilities: Capital Construction and Project Management Forms
For more information, contact UMS Office of Facilities at 973-3334
Hyper-Links are represented by blue, underlined words
A list of documents and forms for capital construction projects appear below. Anyone may view and/or download these documents; however, the inclusion of any form or document in a University contract is the sole responsibility of the University administrator of the contract. The documents below are available as Adobe Acrobat® files, Microsoft Word® or Excel® files. To request paper copy or electronic files, please email Lisa Stawarz-Gagne.
Capital Project Procedures (the section on financials will be updated soon.)
Developing your Storm water Pollution Protection Plan: A Guide for Construction Sites.
Project Planning and Account Create Forms
| Project Budget Form |
| Project Create Form |
| Capital Project Approval Form (New Form) |
| Wage Determination Request |
Wage Determination Request Process |
Capital Construction Design Documents
| Advertisement |
| Supplementary Requirements to AIA Document B141 – 1997 Standard Form of Agreement Between Owner and Architect |
| A/E Interview Letter: Notification to architect/engineer of interview |
| Invoice Payment Transmittal Letter: Letter to notify architects, engineers, or project vendors of payment process |
Capital Construction Documents
Pre-Construction Management Documents
| Pre-Construction Meeting Agenda |
| Bid Open Results: Form for tabulating base bids and filed sub-bids |
| Project Check List: Summary of project data – Submit to System Office of Facilities at time of Bid Opening |
| Percent of Art Contract |
Project Management Letter Templates
| Letter of Intent: Letter of University System intent to sign construction contract |
| Requisition Approval Letter: Transmittal letter for approved Requisition |
| Change Order Request Letter: Transmittal letter for Change Order that needs to be signed and returned |
| Change Order Approval Letter: Transmittal letter for Change Order |
Previous Version of Capital Construction Boiler Plate Documents
Previous versions are no longer on-line. Contact Office of Facilities for assistance with previous documents.
The design and construction contracts and any Project Manual ‘boiler plate’ materials must be assembled by the University administrator, not by an outside party (architect, engineer, or contractor).



